Jackson Jewett
Current Work
Industry Experience
PhD Projects
Master's Work
Profile
Favorite Papers
Jackson Jewett
Current Work
Industry Experience
PhD Projects
Master's Work
Profile
Favorite Papers

Master's Work

 For our design class, we were tasked with designing a high-rise mixed-use structure in the Hudson Yards site in New York City.

Dual-Core Optimization

Click any image to access the journal article explaining this research.

Concrete Optimization

Click on any image for the journal article discussing this research in detail.

Optimized Concrete Testing

 For our Design for Robotic Assembly course, we wanted to program our 6-axis robot to cut styrofoam blocks with a heated wire. Our hope was to cut geometries in a more accurate and faster method than a CNC mill.

Robotic Foam Cutting

 For my Introduction to Making class at MIT, my teammates and I wanted to build a physical game we could play against a robot. We built a game like Pong, where you use paddles to try to knock a ball past the computer's "goal."  I have included a vide

Analog Pong

 During the Fall semester of 2017, our Structural Engineering master's cohort was organized into groups and tasked with designing a long-span roof over an existing courtyard on MIT campus. 

Long-Span Roof

Optimized Cantilever

Topology Optimization

 Delamination failure due to excessive radial forces in curved post-tensioned concrete members has been a problematic and under-appreciated design consideration in structures such as nuclear containment facilities. I built a tool in grasshopper that

Curved Post-Tensioned Concrete

Design of Steel Structures: Pedestrian Bridge

The CommUnity Bridge